Canaan

CANAAN ENGINEERING
CANAAN ENGINEERING PVT. LTD

Testimonials
 
 "I appreciate your focus on the environment and recycling (mentioned on Web site) and prompt response time." -Diane Pratt

"Kevin has been to our home twice. Both times he has done an excellent job! Please give him appropriate recognition. He is an asset to your company!" -Peggy Ekno

"Technician was courteous, professional, and very efficient."

"Thanks to Scott for being so nice each time I call! He is always very courteous and understanding! I never feel that my questions are dumb after I visit with him!" -Sheila Stout

"Best service I've ever received -- polite, professional, and conscientious. Thank you!"

"Great service. Frank was very nice and polite. The work looks great. I can't wait to try it out this winter." -Lynn Owen

"Debbie was very knowledgeable and instrumental in our purchase. City inspector was impressed with professional installation. Service manager and service reps were all very helpful with minor follow up service calls. This new furnace has contributed to keeping our gas bills the same as last year, with gas prices up to double what they were last year." -Charles Smith


Reliance Industries Ltd, Surat, Gujarat

Insitu Retubing of Heat Exchangers at MEG Plant completed at a record time of 5 days

Tube size: 25.4 mm OD x 16 BWG x 6000 lg
Tube MOC: SS 304L
Shell MOC: SS 304L
No of tubes: 681
Location: 3rd Platform at 19 mtr. Elevation.

Retubing of 12 Heat Exchangers at Cracker Plant

The Exchangers were of both U & Straight Bundles
Tube size: 19.05 x 2.11 thk x 6000 mm lg
Tubes were strength expanded & Seal welded
Time of Completion: 8-days/ job
These all jobs were under the jurisdiction of IBR

Inner row Tube replacement for DRIER at PTA Plant completed in a record time of 4 days.
Tube size: 2 inch x 25 mtr lg.
No. of tubes: 45
MOC: SS 304L sch 160

Rewelding of Tube to Tube sheet joints for 12 Heat Exchangers at Cracker Plant.
It is one of the prestigious jobs of its kind on such a record time.

Propylene Condenser (E-555)
Tube size: 19.05 OD x 2.11 mm thk
No. of tubes: 3730/job
Tube sheet Thk: 78 mm
No. of jobs: 6
Completion time: 7 days/job
The tubes were strength welded

Propylene Condenser (E-699)
Tube size: 19.05 OD x 2.11 mm thk
No. of tubes: 3390/job
Tube sheet Thk: 78 mm
No. of jobs: 6
Completion time: 7 days/job
The tubes were strength welded

Reliance Industries Ltd, Jamnagar, Gujarat
Re-tubing of Boiler (ME-RH522-Y07) at Hydrogen Plant
Tube size: 44.5 mm OD x 3.4 mm thk x 7315 mm lg
Tube MOC: SA 213 T11
No. of Tubes: 526
Time of Completion: 11 days

This prestigious job was completed in a record time even though the tubes OD were scaled tremendously thus the tubes were jam-packed. By resorting the latest method we could complete the job in time with perfection.

Re-tubing of 2 Heat Exchangers (371-SO2/371-SO3) at Coker Plant
Tube size: 25.4 mm OD x 2.77 mm thk x 12192 mm lg
Tube MOC: SA 179
No. of Tubes: 3600
Time of Completion: 13 days/job

Re-tubing of 41 Heat Exchangers of Different sizes and materials at VMP Shutdown (October-2005).
SI No Heat Exchanger No Area/Plant Tube Size No Of Tubes Material Of

These all jobs were completed successfully with perfection in a short period of 30 days.

Re-tubing of 21 Fin Fan Coolers in position at the site

Tube size: 25.4 mm OD x 3.05 mm thk x 11 mtr.lg
Tube sheet Thk: 25.4 mm
No. of Tubes: 120/job
Time of Completion: 5 days/job